A) the andon method.
B) the pull method.
C) the jidoka method.
D) the push method.
Correct Answer
verified
True/False
Correct Answer
verified
Short Answer
Correct Answer
verified
View Answer
Multiple Choice
A) Lean systems reduce equipment needs by using larger lot sizes.
B) Lean systems can be implemented in any production environment.
C) Lean systems result in a decrease in safety stock and work-in-process inventory.
D) Lean systems result in an increase in manufacturing lead times.
Correct Answer
verified
Essay
Correct Answer
verified
View Answer
Multiple Choice
A) Inappropriate Processing
B) Waiting
C) Inventory
D) Overproduction
Correct Answer
verified
True/False
Correct Answer
verified
Multiple Choice
A) Motion
B) Overproduction
C) Inappropriate Processing
D) Defects
Correct Answer
verified
Short Answer
Correct Answer
verified
Essay
Correct Answer
verified
View Answer
Multiple Choice
A) It is particularly well suited for making irregularly used parts and customized "specials."
B) It is a "push system," with orders pushed out in anticipation of future requirements.
C) Each container has either a withdrawal or production-ordering Kanban.
D) It does not use poka yoke or 5S practices.
Correct Answer
verified
Essay
Correct Answer
verified
View Answer
Multiple Choice
A) WIP
B) takt
C) OWMM
D) kanban
Correct Answer
verified
Multiple Choice
A) The production line is stopped.
B) The defective unit is passed on to the next workstation.
C) The defective unit is returned to the worker responsible for creating the defect.
D) The production line is made aware of the problem without necessarily stopping the line.
Correct Answer
verified
Essay
Correct Answer
verified
View Answer
True/False
Correct Answer
verified
True/False
Correct Answer
verified
Short Answer
Correct Answer
verified
Multiple Choice
A) decreases the demand for each component.
B) increases repeatability.
C) increases lot sizes more easily.
D) decreases repeatability.
Correct Answer
verified
Multiple Choice
A) uniform assembly schedules
B) specialized workforce
C) high rates of machine failures
D) longer setup times
Correct Answer
verified
Showing 141 - 160 of 166
Related Exams