When laying brick, a(n) ____ course may be required above openings.


A) brick-on-edge
B) soldier
C) extra over
D) over-under

E) All of the above
F) A) and B)

Correct Answer

verifed

verified

Calculating the number of masonry units involves a ____-stage process


A) two
B) three
C) four
D) six

E) A) and D)
F) All of the above

Correct Answer

verifed

verified

The units of measurement for masonry are generally the number of masonry pieces such as concrete blocks or, in the case of bricks, the number of thousands of clay bricks.

A) True
B) False

Correct Answer

verifed

verified

According to The Building Estimator's Reference Book, a 4-inch (102 mm) wall with 1/4-inch (6 mm) brick joints and laid in running bond will have ____ bricks per square foot of wall area.


A) 3
B) 4
C) 7
D) 10

E) C) and D)
F) B) and C)

Correct Answer

verifed

verified

Wire "ladder" reinforcing is required in every third course of blockwork.

A) True
B) False

Correct Answer

verifed

verified

Bond beams are measured as "____" the blockwork in which they are required.


A) extra over
B) over-under
C) in lieu of
D) standardized bricks of

E) B) and D)
F) B) and C)

Correct Answer

verifed

verified

Masonry work does not include scaffolding and hoisting.

A) True
B) False

Correct Answer

verifed

verified

Estimating the costs of masonry work involving products other than standard bricks and concrete blocks can proceed in the same way as with standard bricks and concrete blocks, and is mostly the task of the general contractor.

A) True
B) False

Correct Answer

verifed

verified

There are more variables to consider with concrete blocks than with clay bricks.

A) True
B) False

Correct Answer

verifed

verified

In accordance with the general principles followed in the measurement of the work of other trades, masonry work is measured "____."


A) net removed
B) net in place
C) composite in place
D) composite removed

E) C) and D)
F) All of the above

Correct Answer

verifed

verified

Masonry work includes construction with clay bricks, concrete bricks and blocks, clay tiles, and natural and artificial stone.

A) True
B) False

Correct Answer

verifed

verified

Masonry work is now typically performed by subcontractors who supply the labor, materials, and equipment required to complete the work.

A) True
B) False

Correct Answer

verifed

verified

Estimators need to be familiar with the definition of the scope of work for the masonry trade in their ____.


A) geological location
B) climate
C) geographical location
D) regional requirements

E) A) and D)
F) B) and D)

Correct Answer

verifed

verified

All of the following are categories of masonry work EXCEPT:


A) flood protection
B) fire protection
C) walls and partitions
D) facings

E) A) and B)
F) A) and C)

Correct Answer

verifed

verified

A

Mortar is measured in cubic yards or cubic meters.

A) True
B) False

Correct Answer

verifed

verified

For the volume of mortar per square foot of wall area, the volume of brick plus joints is calculated times the volume of brick per square foot of wall area.

A) True
B) False

Correct Answer

verifed

verified

Trade rules in some locations require the subcontractor supplying reinforcing steel to the project to supply the rebar for the masonry work.

A) True
B) False

Correct Answer

verifed

verified

True

The main factors affecting the measurement of brick masonry are the size of the brick units, the size of the joints between bricks, the wall thickness, and the pattern of brick bond utilized.

A) True
B) False

Correct Answer

verifed

verified

True

Bricks are available in a great number of sizes, but the Common Brick Manufacturers Association has adopted a standard size with the nominal dimensions of ____.


A) 2 1/4 by 3
3/4 by 8 inches
B) 2 1/4 by 4
3/4 by 8 inches
C) 2 1/4 by 3
3/4 by 6 inches
D) 2 1/4 by 4
3/4 by 6 inches

E) None of the above
F) A) and C)

Correct Answer

verifed

verified

A typical example of the kind of work item that is related to masonry work but may not be included in the quote from a subtrade is the item of ____ during construction.


A) foundation masonry work
B) reinforcing masonry work
C) finishing masonry work
D) temporary-bracing masonry work

E) B) and C)
F) None of the above

Correct Answer

verifed

verified

Showing 1 - 20 of 20

Related Exams

Show Answer