Filters
Question type

Study Flashcards

Outsourcing is the delegation of specific work to a third party for a specified length of time, at a specified cost, and at a specified level of service.

Correct Answer

verifed

verified

_____ testing determines if a system meets the business requirements and enables end users to correctly perform their jobs.

Correct Answer

verifed

verified

Which of the following systems development techniques requires IT specialists that are in-house to develop business applications?


A) Outsourcing
B) Insourcing
C) Netsourcing
D) Selfsourcing

Correct Answer

verifed

verified

Extreme programming (XP) methodology breaks the project down into many smaller pieces or phases.

Correct Answer

verifed

verified

Users should not be involved in the prototyping process.

Correct Answer

verifed

verified

The SDLC contains 7 phases. Which phase monitors and supports the new system to ensure it continues to meet your business goals?


A) Implementation
B) Testing
C) Maintenance
D) Operations

Correct Answer

verifed

verified

In which SDLC phase do you build the platform for the proposed information system along with the database and the programs?


A) Development
B) Implementation
C) Design
D) Transformation

Correct Answer

verifed

verified

The _____ methodology, a form of XP, aims for customer satisfaction through early and continuous delivery of useful software components.

Correct Answer

verifed

verified

What is a common test that is performed to ensure the quality of the information system you are building?


A) Unit and system testing
B) User acceptance testing
C) Integration testing
D) Unit, systems integration, and user acceptance testing

Correct Answer

verifed

verified

Users begin using the new system during the _____ phase of the SDLC.

Correct Answer

verifed

verified

During analysis, specific activities occur. Which of the following is not one of these activities?


A) Gather the business requirements
B) Evaluate alternative logical designs for the proposed system
C) Prioritize business requirements
D) Sign-off on the requirements definition document

Correct Answer

verifed

verified

What is the fourth and last step in the prototyping process?


A) Identify basic requirements
B) Develop initial prototype
C) Users reviewing
D) Revise and enhance the prototype

Correct Answer

verifed

verified

The project plan is a written definition of the project scope and is usually no longer than a paragraph.

Correct Answer

verifed

verified

Prototyping is an essential part of the RAD methodology.

Correct Answer

verifed

verified

The _____ of the SDLC involves determining a solid plan for developing your information system.

Correct Answer

verifed

verified

What is a process of building a model that demonstrates the features of a proposed product, service, or system?


A) RAD
B) XP
C) Prototyping
D) Modeling

Correct Answer

verifed

verified

The implementation phase includes monitoring and supporting the new system to be sure it meets business goals.

Correct Answer

verifed

verified

The SDLC contains 7 phases. Which phase builds a technical blueprint of how the proposed system will work?


A) Design
B) Planning
C) Analysis
D) Development

Correct Answer

verifed

verified

Which of the following is not a main reason behind the rapid growth of the outsourcing industry?


A) Globalization
B) The Internet
C) Technology
D) Decreasing economy

Correct Answer

verifed

verified

A(n) _____ defines the work to be done, the time frame, the metrics that will be used to measure the success of the systems development effort, and the costs.

Correct Answer

verifed

verified

service le...

View Answer

Showing 141 - 160 of 195

Related Exams

Show Answer