Which of the following is one of the main purposes of a MRP system?


A) Educate personnel in basic work rules
B) To determine time schedules for material procurement
C) Stimulate the work force
D) Decrease labor requirements
E) Increase inventory accuracy

Correct Answer

verifed

verified

A material requirements planning (MRP)system with information feedback from its module outputs is termed a "closed-loop MRP" system.

Correct Answer

verifed

verified

If annual demand is 6,125 units,annual holding cost is $5 per unit and setup cost per order is $50,which of the following is the EOQ lot size?


A) 350
B) 247
C) 230
D) 185
E) 78

Correct Answer

verifed

verified

Low Level coding in MRP indicates the exact status of each item managed by the system in "real time".

Correct Answer

verifed

verified

Which of the following is the net requirement using an MRP program if the gross requirement is 1,250 and the inventory on hand is 50?


A) 1,200
B) 1,300
C) 1,150
D) 2,450
E) None of the above

Correct Answer

verifed

verified

One of the main purposes of a MRP system is which of the following?


A) Track inventory Levels
B) Create productive capacity
C) Decrease layers of management
D) Develop schedules for when each component should be produced
E) Upgrade manufacturing's professionalism

Correct Answer

verifed

verified

Which of the following is most closely related to the reason a firm might implement MRP?


A) So they can order the right parts
B) So they can order parts sufficient for immediate use
C) So they can insure that parts to arrive prior to when they are needed
D) To assure appropriate quality Levels
E) To keep process costs between the LCL and the UCL

Correct Answer

verifed

verified

The least total cost method (LTC)lot-sizing technique calculates the order quantity by comparing the carrying cost and the setup (or ordering)costs for various lot sizes and then selects the lot in which these are most nearly equal.

Correct Answer

verifed

verified

A necessary input to the material requirements planning (MRP)system is an exception report.

Correct Answer

verifed

verified

Which of the following is a capability of MRP systems that improves operations planning and control?


A) MRP indicates when to de-expedite as well as expedite orders
B) MRP systems consume many reams of paper thereby justifying quantity purchases
C) Once entered;a production order can't be changed,enforcing discipline on sales
D) MRP can anticipate returns of defective product
E) MRP allows manufacturing to operate in a pure,isolated environment

Correct Answer

verifed

verified

Which of the following industry types have high expected benefits from the application of MRP?


A) Fabricate-to-order
B) Hospitals
C) Assemble-to-order
D) Aircraft manufacturers
E) Oil refineries

Correct Answer

verifed

verified

MRP systems seek to achieve which of the following?


A) Minimize lot sizes
B) Determine the number of dependent demand items needed
C) Give immediate capacity relief
D) Provide a yardstick for future improvements
E) Improve on JIT methods

Correct Answer

verifed

verified

A modular bill of materials is the term for an item that can be produced and stocked as a subassembly.

Correct Answer

verifed

verified

If annual demand is 1,000 units,annual holding cost is $0.50 per unit and the cost per order is $10,what is the EOQ?

Correct Answer

verifed

verified

A modular bill of materials includes items with fractional options.

Correct Answer

verifed

verified

The difference between the number of units currently included in the master schedule and the number of units in firm customer orders is often called "available to promise".

Correct Answer

verifed

verified

The MRP program performs its analysis from the bottom of the product structure trees up,imploding requirements Level by Level.

Correct Answer

verifed

verified

Which of the following is the planned-order release using an MRP program if the gross requirement is 670 and the inventory on hand is 600?


A) 670
B) 600
C) 530
D) 70
E) None of the above

Correct Answer

verifed

verified

One of the biggest complaints by users of MRP systems is that MRP is too flexible in making changes in schedules when the need arises.

Correct Answer

verifed

verified

The "theme" of MRP is getting the right materials to the right place before they are needed.