Cyclone Appliances has developed a new European-style convection oven that will be made on an assembly line.The schedule requires 80 ovens in an 8-hour day.The assembly includes seven tasks.The table below indicates the performance time and the sequence requirements for each task. Cyclone Appliances has developed a new European-style convection oven that will be made on an assembly line.The schedule requires 80 ovens in an 8-hour day.The assembly includes seven tasks.The table below indicates the performance time and the sequence requirements for each task.    (a)What is the cycle time for this assembly operation? (b)What is the theoretical minimum number of workstations? (c)Draw the precedence diagram. (a)What is the cycle time for this assembly operation? (b)What is the theoretical minimum number of workstations? (c)Draw the precedence diagram.

Correct Answer

verifed

verified

(a)The cycle time is 480 minutes per day...

View Answer

Which of the following is NOT a retail layout practice?


A) Locate the high-draw items around the periphery of the store.
B) Distribute power items throughout the store.
C) Use end-aisle locations to maximize product exposure.
D) Use prominent locations for high-impulse and high-margin items.
E) All of the above are retail layout practices.

Correct Answer

verifed

verified

"A special arrangement of machinery and equipment to focus on production of a single product or group of related products" describes what layout type?


A) fixed-position layout
B) intermittent production
C) job shop
D) work cell
E) warehouse layout

Correct Answer

verifed

verified

Develop a solution for the following line balancing problem,allowing a cycle time of 5 minutes. a.Draw the precedence diagram for the set of tasks. b.Calculate the theoretical minimum number of workstations. c.Balance this line using the longest task time heuristic. d.What tasks are assigned to which stations? e.Does the solution have the minimum number of stations? Explain. f.How much idle time is there,summed over all workstations? g.What is the efficiency of this line? Develop a solution for the following line balancing problem,allowing a cycle time of 5 minutes. a.Draw the precedence diagram for the set of tasks. b.Calculate the theoretical minimum number of workstations. c.Balance this line using the longest task time heuristic. d.What tasks are assigned to which stations? e.Does the solution have the minimum number of stations? Explain. f.How much idle time is there,summed over all workstations? g.What is the efficiency of this line?

Correct Answer

verifed

verified

The theoretical minimum number of workst...

View Answer

In a product-oriented layout,what is the process of deciding how to assign tasks to workstations?


A) station balancing
B) process balancing
C) task allocation
D) assembly-line balancing
E) work allocation

Correct Answer

verifed

verified

What is the primary reason why retailers tend to locate high-draw items around the periphery of the store?


A) More shelf space for those popular items is available around the periphery.
B) There will be less congestion of customers than there would be in the middle.
C) This arrangement will help to maximize customer exposure to other items in the store.
D) It is easier to put large advertisement signs on the outside walls right next to the items.
E) This arrangement allows customers to travel through the store as quickly as possible.

Correct Answer

verifed

verified

The work cell improves layouts by reducing both floor space and direct labor cost.

Correct Answer

verifed

verified

A firm operates a flow shop building kitchen cabinetry for recreational vehicles.The major activities of this process are listed below. A firm operates a flow shop building kitchen cabinetry for recreational vehicles.The major activities of this process are listed below.    a.Draw the appropriate network for this project. b.What would the cycle time be if the goal is to produce 20 units per month (the plant operates 160 hours per month)? c.What is the theoretical minimum number of workstations needed? d.Balance with the most following tasks heuristic.What tasks are assigned to which stations? e.What is the efficiency of the line obtained in part d? a.Draw the appropriate network for this project. b.What would the cycle time be if the goal is to produce 20 units per month (the plant operates 160 hours per month)? c.What is the theoretical minimum number of workstations needed? d.Balance with the most following tasks heuristic.What tasks are assigned to which stations? e.What is the efficiency of the line obtained in part d?

Correct Answer

verifed

verified

blured image blured image (b)The cycle time is 160/20 = 8 hours;...

View Answer

A focused work center is well suited to the production of a large family of products requiring similar processing,even if their demands are not very stable.

Correct Answer

verifed

verified

A manufacturing work cell has a takt time of 7 minutes.Exactly 10 workers are required.Suppose that the work cell delivers 68 units each day. (a)What is the total operation time? (b)What is the amount of time worked during the day for all 10 workers combined? (c)If the plant is open for only 8 hours per day,can the staff meet demand?

Correct Answer

verifed

verified

(a)Total operation time = Workers requir...

View Answer

In what specific areas does the layout decision establish a firm's competitive priorities?

Correct Answer

verifed

verified

Layout decisions establish a f...

View Answer

A(n)________ line is a machine-paced product-oriented facility for building components.

Correct Answer

verifed

verified

Which of the following is one of the main advantages of a product-oriented layout?


A) high customer exposure rates
B) employability of highly skilled labor
C) high flexibility
D) low capital cost
E) low variable cost per unit

Correct Answer

verifed

verified

Briefly explain what "slotting" is.What ethical issues might arise with regard to slotting?

Correct Answer

verifed

verified

Slotting is the practice of manufacturer...

View Answer

________ is the pace (frequency)of production necessary (time per unit)to meet customer orders.

Correct Answer

verifed

verified

Cycle time is the maximum time that the product is allowed at each workstation.

Correct Answer

verifed

verified

Balancing a work cell is done:


A) before the work cell equipment is sequenced.
B) as part of the process of building an efficient work cell.
C) before takt time is calculated.
D) so that each assembly line workstation has exactly the same amount of work.
E) to minimize the total movement in a process layout.

Correct Answer

verifed

verified

Identify the five common layout heuristics used to assign tasks to workstations in assembly-line balancing.

Correct Answer

verifed

verified

(1)longest task (operation)tim...

View Answer

Category management is the use of computer software to evaluate the profitability of various merchandising plans for hundreds of categories.

Correct Answer

verifed

verified

A product-oriented layout would be MOST appropriate for which one of the following businesses?


A) fast food
B) steel making
C) insurance sales
D) clothing alterations
E) a grocery store

Correct Answer