Long production runs,poor material flows,and processes that are not tightly linked to one another can cause over 90% of a product's lead time to be spent waiting.

Correct Answer

verifed

verified

An OWMM arrangement reduces labor requirements but increases inventory.

Correct Answer

verifed

verified

Group technology collects similar parts into families and organizes machine tools into separate cells.

Correct Answer

verifed

verified

What are the four underlying principles of the Toyota Production System?

Correct Answer

verifed

verified

The four underlying principles are: (1)a...

View Answer

The takt time of a process is defined as:


A) the cycle time needed to match the rate of production to the rate of consumption.
B) the total time required to move an item through a process.
C) the time required to change a machine to run a new model.
D) the lead time necessary to notify maintenance that a problem has occurred in an operation.

Correct Answer

verifed

verified

Regarding the Eight Types of Waste that must be eliminated to implement lean systems,using expensive high precision equipment when a simpler machine would suffice is part of which general waste category?


A) Motion
B) Overproduction
C) Inappropriate Processing
D) Defects

Correct Answer

verifed

verified

________ practices include early testing of machine parts that may need to be replaced and making workers responsible for routine minor maintenance of their own equipment.

Correct Answer

verifed

verified

Total Prev...

View Answer

What are the organizational issues companies must address before implementing a lean system?

Correct Answer

verifed

verified

The organizational issues faced by compa...

View Answer

Jones Electric Motors uses a Kanban system to make motors for several garage door companies in the southeastern United States.The daily demand for motor housings used in manufacturing is 100 units.The average waiting time for a container of parts is 0.2 day.The processing time for a container of housings is 0.1 day,and a container holds 5 housings.If Jones wishes to use a 10% policy variable,how many containers are needed?

Correct Answer

verifed

verified

k = blured image = blured image = ...

View Answer

An item sells at a rate of 240 units per day.If a plant works one shift per day (480 minutes),what takt time is required for the plant to meet this demand?

Correct Answer

verifed

verified

480 minutes per day ...

View Answer

The production of 150 units during a 480-minute work shift results in a takt time of:


A) 150 seconds.
B) 192 seconds.
C) 120 seconds.
D) 18.8 seconds.

Correct Answer

verifed

verified

The four bolts that hold the passenger seat in a pickup truck are tightened in a clockwise order beginning with the front right bolt,in 24 seconds.This production factoid illustrates which of the following principles of the Toyota Production System?


A) All work must be specified as to content.
B) Every customer-supplier connection must be direct and unambiguous.
C) The pathway for every service and product must be direct.
D) Any improvements to the system must be made in accordance with the scientific method.

Correct Answer

verifed

verified

With respect to lean systems,what is the advantage of standardized components?

Correct Answer

verifed

verified

Standardization tends to incre...

View Answer

In manufacturing systems,one way to achieve continuous improvement can be to maintain low inventories,and periodically cut safety stocks almost to zero.

Correct Answer

verifed

verified

In the Toyota Production System,services and goods flow to the next available person or machine to maintain smooth,rapid flow.

Correct Answer

verifed

verified

In lean systems,the need for single-digit setups is driven by the desire for small lot sizes.

Correct Answer

verifed

verified

A plant's manufacturing process has a takt time of 90 seconds per unit.This results in a process output of how many units per hour?

Correct Answer

verifed

verified

60 minutes per hour × 60 secon...

View Answer

A ________ is based on both a withdrawal card and a production-order card,to control inventory quantities more closely.

Correct Answer

verifed

verified

two-card K...

View Answer

________ refers to mistake-proofing methods aimed at designing fail-safe systems that minimize human error.

Correct Answer

verifed

verified

In the Toyota Production System,all work must be completely specified as to ________,________,________ and ________.

Correct Answer

verifed

verified

content,se...