The final decision as to what standard costs should be is the responsibility of
A) the quality control engineer.
B) the managerial accountants.
C) the purchasing agent.
D) management.
Standard Costs
The predetermined costs associated with manufacturing a product or providing a service, used as benchmarks for measuring performance.
Quality Control
The process of ensuring that products and services meet certain standards and are free from defects.
- Understand the contribution and accountability of diverse departments within variance analysis and standard costing procedures.
Verified Answer
AH
Learning Objectives
- Understand the contribution and accountability of diverse departments within variance analysis and standard costing procedures.
Related questions
The Starting Point for Determining the Causes of an Unfavorable ...
There Could Be Instances Where the Production Department Is Responsible ...
The Labor Time Requirements for Standards May Be Determined by ...
The Variance from Standard for Factory Overhead Resulting from Incurring ...
The Most Effective Means of Presenting Standard Factory Overhead Cost ...